Go to content

EvoControl Ventilation - Light - MPO

Models: A30T G3 Light, A60T G2 Light

6.2 Start-up / Start-up sequence

When an operating mode is selected in the ventilation unit, the extract fan and the heat exchanger start first.
The supply air fan has a start delay of at least 30 seconds.

The start-up may last longer than the set values:

  • When control is waiting for signals from fans, it can take up to 10 minutes.
  • When control is waiting for signals from the heat exchanger, see Description - Heat recovery.

Reservation for errors or linguistic discrepancies that may have arisen during printing, translation or assisted text processing. In case of discrepancies between language versions, the original Swedish version applies. See conditions.

© 2026 Acetec AB. All rights reserved.